Friday, February 19, 2010

Having Experience with Symmetricom Synchronization Supply Unit (SSU) installation & commissioning


  1. Installation, commissioning and troubleshooting of Symmetricom SSU2000e and TimeCesium 4400.
  2. TimeCraft 2.1v software is used for SSU 2000e and MonitorMaster for TimeCesium.

Thursday, February 18, 2010

Having Experience with Motorola BTS Installation and commissioning for GSM Network

  1. Motorola BTS Installation & Commissioning (Online and offline) with expansion cabinet.
  2. Tx Calibration by using Power Meter for CTU2 calibration for Motorola BTS.
  3. Rx Calibration by using Signal Generator for CTU2 calibration for Motorola BTS.
  4. ProComm 4.5v Commissioning software for Motorola BTS.
  5. Taking VSWR by using Anritsu S331D Master & documentation by Handheld Software.
  6. BTS test call by using Engineering Function Mobile (FTS).
  7. Drive test by using ERICSSON TEMS.

Research, Study, Skills, and Information over view


Skills

  1. Electronic Document Management System (EDMS) for Document Imaging (Visual Studio .NET 2005 & MySQL Database) for Banglalink SAF  Archive.
  2. Banglalink SAF Form Entry and Store in Different Database like Oracle10g, MySQL 5.0 and SQL Server 2005.
  3. Presentation by using Macro Media FLASH and Power Point.
  4. PABX System Software (Language in Used: Visual C++).
  5. TAPI Control Auto Answering Machine for Telephone User (Language: Visual Basic 6.0)
  6. HTML, PHP 5.0, XML .net, MySQL 5.0, Apache Web Server.
  7. Web Database: MySQL 5.0, Oracle, Microsoft Access, and Microsoft Provided SQL Server 2005.
  8. My Creation WEB Sites: www.dhakaphone.com, www.sealjo.com, www.nourbangla.com, www.trxoptimizations.com

Others:

  1. Networking with Windows 2000, 2003 and Linux Server.
  2. Security for Windows 2000 & 2003 server, Windows 2000 professional, Windows XP.

Educational Background

Educational Background

1. B.Sc. in Computer Science & Engineering (CSE)

The University of Asia Pacific, Dhaka

Year of Study: 2002-2006

Passing Year: 2006

Current CGPA: 3.10 (Out of 4.00)


2. Higher Secondary Certificate (H.S.C)

Raigaon College, Naogaon

Group: Science, Rajshahi Board

1st Division, Passing Year: 2000

 

    3. Secondary School Certificate (S.S.C)

    Mallikpur M.M.J.B High School, Naogaon

    Group: Science, Rajshahi Board

    1st Division, Passing Year: 1998

Number of completion site



SL
Site Name
Equipment
Type of works
Number of Sites
1.
BSC
Motorola
Installation
3
2.
BTS
Motorola
Installation + Commissioning
97 +127
3.
RBS
Ericsson
Installation & Commissioning
43
4
BTS
Huawei
Installation & Commissioning
5
5.
SDH Link
Marconi (LMT)
Installation & Commissioning
8
6.
PDH Link
Ericsson (Minilink TN)
Installation & Commissioning
37

Having Experience with XCAL & XCAP of Accuver Products

  1. Drive Test by using XCAL, XCAP, TEMS & Post processing to perform Network quality.
  2. Prepare & analyze reports based on drive test results.
  3. Analysis the fault management system and prepare report from network and finally give appropriate solution.
  4. Check and assurance the installation quality.
  5. Finally prepare the site and update Acceptance Documents (PAT) for new BTS and SWAP site.
  6. Working with Temporary BTS COW, Motorola site.

Practical Training

1. HUAWEI GBTS312 & GBTS3012 Training: I have attended theory and practical training at HUAWEI GBTS312 & GBTS3012.

2. ERICSSON TEMS v8.2: I have a short training of ERICSSON TEMS v8.2. Training Venue: TRX Optimizations at Gulshan-2.

Having Experience with Marconi

I have practical experience in installation, commissioning, troubleshooting Marconi SDH Short Haul and Long Haul Radio System MDRS155S, Ericsson Radio System MINILINK TN.
● Installation, commissioning and troubleshooting of transmission network.
● Installing 1+0, 1+1, 2+0, Space Diversity (SD) system Integrated, Non Integrated, Normal Density, High Density systems of Ericsson Equipments.

Having Experience with HUAWEI GBTS312 & 3012 installation & commissioning for GSM Network

  1. Installation, commissioning and troubleshooting of GBTS 312&3012 BTS and prepare site for PAT.
  2. Maintain the site quality.
  3. BTS configuration and alarm checking.

Having Experience with Alcatel-Lucent WBS Installation & Commissioning for WiMAX

  1. Installation of full power and antenna system.
  2. Optical Fiber connection at WiMAX sites.
  3. Commissioning and Integration of WBS.
  4. Finally Drive Test by using XCAL and reporting by XCAP (a product of Accuver).